Terra-Gen brings online final phase of 365-MW Lockhart Solar project
Terra-Gen, jointly owned by Masdar and Igneo Infrastructure Partners, announced that its Lockhart Solar PV IV project has reached commercial operations. The 80-MW project in San Bernardino County…
Read the full articleYou might also wanna read
Terra-Gen energizes Lockhart Solar IV in southern California
Utility-scale solar developer, owner, and operator Terra-Gen has reached commercial operation on the Lockhart IV solar project in San Bernar
First phase of $1.1 billion Texas solar farm goes online, powering AT&T and Toyota
The project's launch also reflects a broader shift across the energy sector. May 31, 2026 Sequoia Solar, in Callahan County, Texas, has offi
Matrix Renewables and SOLV Energy begin construction on 457MW Texas solar project
Matrix Renewables and SOLV Energy have commenced construction on the Tormes Solar Project, a 457MWdc facility in Navarro County, Texas.
Masdar acquires 49.99% stake in Repsol's 705 MW Spanish renewable portfolio for €849 million
Repsol and the UAE-based Masdar have signed an agreement under which Masdar will acquire a 49.99% stake in a renewable energy portfolio loca
San Diego County delays decision on 588-acre Starlight Solar farm project in Boulevard
The project would industrialize about 588 acres near Old Highway 80 within the unincorporated East County community of Boulevard.
Renewable energy news: Masdar, Aura Power, NextEnergy
Today’s renewable energy news includes announcements from Masdar, Aura Power, NextEnergy, among others. Masdar Secures USD 6.1 Billion Finan

Comments
Sign in to join the conversation.
No comments yet. Be the first.