Conexon slows some builds, citing 'severely constrained' fiber supply
In updates to the FCC about its RDOF builds, Conexon Connect said 'unprecedented demand' for domestic fiber has led to 'severely constrained' availability, which is 'expected to slow its deployment…
Read the full articleYou might also wanna read
U.S. Fiber Optic Infrastructure Expands
Demand for fiber optic infrastructure for cloud and 5G is leading a series of trends -- and a conference in Nashville June 12 -15

Energy Constrained Data Centers: Build Your Campus
Key Takeaways: Grid interconnect delays and limited power availability have become the primary bottleneck for data center expansion, with so
Sponsored: Prysmian on building scalable fiber infrastructure for future AI and technology needs
Chosen and installed properly, the fiber laid today should still be earning its place long after this generation of AI hardware has been ret
Power shortages, not land or capital, are derailing half of US data center projects
Why the industry must continue to look beyond the grid

Smarter, not faster: AI infra’s sobering effect on fiber strategy
While the AI data center boom is undoubtedly an opportunity for the fiber industry, it also presents something of a challenge.
Breakthrough Hollow-Core Optical Fiber Achieves Record-Low Signal Loss and 45% Faster Data Transmission
Despite the modern world relying heavily on digital optical communication, there has not been a significant improvement in the minimum atten

Comments
Sign in to join the conversation.
No comments yet. Be the first.