autonocion.com · 6 min
TEPCO's robotic arm has begun its mission inside Fukushima's Unit 2 reactor. It squeezed through a 22-inch opening and will spend months cutting steel with water jets before it can even try to retrieve fuel fragments. The two previous attempts recovered less than a gram of the 880 tons still inside.


