All Topics
All Topics
Technology
Technology
Design
Design
Programming
Programming
Science
Science
News
News
Gaming
Gaming
Entertainment
Entertainment
Business
Business
Finance
Finance
Sports
Sports
Health
Health
Food
Food
Travel
Travel
Art
Art
Music
Music
Books
Books
Education
Education
Politics
Politics
Personal
Personal
Bluesky
Twitter
No algorithm. No AI slop. No ads. Just RSS. Pro-human. Indie writers. Real journalism. Open web. Chronological. Hand toasted.

SRP and Aypa Power bring 250 MW / 1 GWh battery storage facility online in Mesa, Arizona

By

@Enerdata

1h ago· 1 min readenNews

Summary

Salt River Project (SRP) and Aypa Power have announced the Pediment Battery Energy Storage System (BESS) is now fully operational in Mesa, Arizona. The 250 MW / 1,000 MWh facility, located in the Elliot Road Technology Corridor, is supplying electricity to customers. The project was acquired by Aypa Power from developer Eolian in 2024.

Source

bskySRP and Aypa Power bring 250 MW / 1 GWh battery storage facility online in Mesa, Arizonaenerdata.net

Key quotes

· 2 pulled
Salt River Project (SRP) and Aypa Power have announced that the Pediment Battery Energy Storage System (BESS), a 250 MW / 1,000 MWh facility located in the Elliot Road Technology Corridor in Mesa, Arizona, is now fully operational and supplying electricity to customers
The Pediment project, which was acquired by Aypa Power from US battery storage developer Eolian in 2024
Snippet from the RSS feed
Salt River Project (SRP) and Aypa Power have announced that the Pediment Battery Energy Storage System (BESS), a 250 MW / 1,000 MWh facility located in the Elliot Road Technology Corridor in Mesa, Arizona, is now fully operational and supplying electricit

You might also wanna read