Rieder Constructs Timber-Hybrid Production Hall at Austrian Headquarters
By
Dezeen staff
A baker's-dozen of insight crammed into one ring.
Summary
Austrian facade specialist Rieder has unveiled a new production hall at its headquarters in Maishofen, Austria, constructed using a timber-hybrid approach with over 1,300 square metres of wood. The hall, designed by architecture practice Kessler, combines wood and concrete to optimize the benefits of both materials - concrete for durability and fire protection, and wood for environmental sustainability and aesthetic appeal. The project represents an innovative approach to industrial construction that balances functional requirements with environmental considerations.
Key quotes
· 3 pulledThe hall, designed by architecture practice Kessler, was constructed from a mix of wood and concrete, which Rieder said has allowed for optimal use of both materials.
Concrete was chosen for its durability and fire-protective quality, while wood was selected for its environmental credentials and warm aesthetic.
Austrian facade specialist Rieder has unveiled a production hall at its headquarters in Maishofen, Austria, built with over 1,300 square metres of timber.
You might also wanna read

Wataru Architects Renovates Kitaoka Group Headquarters with 50-Metre Skylight in Japan
Tokyo architecture studio Wataru Architects renovated the 40-year-old Kitaoka Group headquarters in Mima City, Japan, transforming it into a

Ceramics of Italy International Tile Competition 2026 opens for entries
Confindustria Ceramica and the Italian Trade Agency have opened entries for the 2026 Ceramics of Italy International Tile Competition. The a

Gensler unveils design for Trump Tower development in Tbilisi, Georgia featuring 70-storey skyscraper
Designs have been revealed for a Trump Tower development in Tbilisi, Georgia, designed by architecture firm Gensler. The project will featur

Dezeen Weekly podcast: Examining the gender pay gap in architecture and industry challenges
This episode of Dezeen Weekly discusses the gender pay gap in architecture, exploring why there are few women in top architecture jobs. The

Jeddah Tower construction reaches 100th floor, photos reveal
US architecture firm Adrian Smith + Gordon Gill Architecture has released exclusive photos showing construction progress on Jeddah Tower in

São Paulo Skyscraper Features Rare Wood Cladding by Brazilian Architects
Brazilian architecture firm Königsberger Vannucchi Arquitetos Associados has completed the Bueno Brandão 257 residential skyscraper in São P
