Planning staff briefs board on land-use ordinance updates, battery storage setbacks, and DNR floodplain corrections
By
Citizen Portal
Summary
County planning staff briefed the board on proposed land-use ordinance updates, including standards for battery energy storage systems and required floodplain corrections mandated by the Minnesota Department of Natural Resources. The planning commission recommended adopting the changes with a technical note on delegating interim-use setbacks for battery storage. Work on the revisions began in March and included a public comment period.
Source
Key quotes
· 2 pulledReed, planning staff, summarized the project timeline (work began in March, public comment
Planning staff reported the planning commission recommended adopting proposed land‑use ordinance changes with a technical note on delegating interim‑use setbacks for battery energy storage systems
You might also wanna read

Batteries and Buildings
mtende.blog·11mo agoCalifornia's Battery Energy Storage Investments Eliminate Grid Emergency Alerts Since 2022
California has reached a turning point in its energy reliability, with no Flex Alert emergency conservation calls since 2022 due to signific
US Battery Storage Installations Reach Record High in 2025 Despite Political Challenges
The article reports that the US experienced a record-breaking boom in battery energy storage installations in 2025, according to a solar ind
Hyundai Delays EV Battery Plant Construction by 2-3 Months Following ICE Raid
Hyundai is delaying construction of its electric vehicle battery plant by 2-3 months following a raid by ICE (Immigration and Customs Enforc
electrek.co·9mo ago