All Topics
All Topics
Technology
Technology
Design
Design
Programming
Programming
Science
Science
News
News
Gaming
Gaming
Entertainment
Entertainment
Business
Business
Finance
Finance
Sports
Sports
Health
Health
Food
Food
Travel
Travel
Art
Art
Music
Music
Books
Books
Education
Education
Politics
Politics
Personal
Personal
No algorithm. No AI slop. No ads. Just RSS. Pro-human. Indie writers. Real journalism. Open web. Chronological. Hand toasted.

Energinet extends pause on grid connections; waiting times may reach 5-10 years for large installations

By

William Alkærsig Springer

4d ago· 1 min readdaNews

Summary

Denmark's state-owned electricity grid company Energinet has extended its pause on new connections to the electricity grid, originally set for three months in March, until autumn. For larger installations, waiting times could reach 5-10 years due to delays in expanding the transmission network.

Key quotes

· 3 pulled
Energinets pause for tilslutning til elnettet forlænges til efteråret.
Tidshorisonten for større anlæg kan samtidig vare op til 5-10 år.
I marts satte det statslige elnetselskab Energinet tilslutningen af nye projekter til elnettet på pause i tre måneder med det argument, at udbygningen af transmissionsnettet,…
Snippet from the RSS feed
En ny model, der forlænger pausen for tilslutning til elnettet kan for større anlæg betyde, at ventetiden kan løbe op mod 5-10 år, oplyser Energinet i en pressemeddelelse.

You might also wanna read

South Australia awards 1.3GW battery storage capacity in inaugural FERM tender

South Australia has announced the results of its first Firm Energy Reliability Mechanism (FERM) tender, awarding contracts to six Battery En

energy-storage.news·1d ago

Why the aging power grid traps consumers in endless costs — and how localized energy offers a way out

The article argues that the traditional centralized power grid, much of which was built in the 1950s, is a financial burden on consumers who

coyotegulch.blog·3d ago

Australia ranks third globally in battery capacity as Western Australia leads national growth

Australia ranks third globally for battery capacity, with Western Australia leading the nation in grid-scale battery installations. The arti

abc.net.au·4d ago

Better tracking systems could help reduce U.S. grid connection delays for electrification projects

The article discusses how accelerating electrification in the U.S. (homes switching to electric appliances, EV adoption, clean energy projec

blogs.edf.org·4d ago

Africa's power sector shifts toward solar, wind, and battery storage as coal and hydropower decline

Africa's energy sector is undergoing a major shift as new power projects increasingly focus on solar, wind, and battery storage instead of c

abcnews.com·5d ago

TVA considers separate electric rate structure for AI data centers amid rising power demand

The Tennessee Valley Authority (TVA) is considering changes to its electric rate structure as power demand from large data centers grows acr

newschannel9.com·5d ago